Field design
Opening draft…
Search for the address and mark the site location. Add the transformer, service cabinet, panel and chargers, then draw the cable routes. For your first steps, open Getting started or explore Example site.
Yes. Mark the site location on the map, then switch to Site photo. Upload the photo and set its scale using two points with a known distance between them. Add equipment and cable routes to the photo. The map does not need to load to export a photo-based PDF.
Use Add photos to upload multiple images. Each photo keeps its own drawing and scale; use the tabs to switch between them. In Summary, select which photos to include and which to show as clean sketches without the photo. Choose the quantity source separately; lengths are not added together even if the same route appears in several photos.
Route length is the line drawn on your plan. Energy cable length also includes the vertical length and cable allowance you enter; parallel cables increase the cable requirement. Photo measurements are approximate and depend on scale and perspective. Verify distances on site.
Your draft is saved automatically only in this browser on this device, not in the cloud or your Toger account. To back it up or continue on another device, use Download project, then load the file with Open project on the other device. Always make a backup before clearing browser data.
The report includes your selected drawings, site coordinates if marked, survey details, equipment and cable quantities. Use Include in report and Clean sketch in Summary to choose the visuals. Quantities and power estimates come only from the selected primary drawing; other drawings are visual references.
No. This tool is for preliminary surveys and planning. Measurements, cable sizes, power requirements and protective devices must be checked against site conditions and approved by an authorized electrical engineer.